Download PDR_February_2001
Document related concepts
no text concepts found
Transcript
Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN First Stage Cryogenic IF Amplifier Groningen, 1-2 February 2001 FPU Preliminary Design Review 1 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN CONTENTS • DM Program – New Devices – New Design – Results • QM & FM Programs: Fabrication by the Industry – Transfer to Industry – Processes – Components • Summary of critical items • Planning Groningen, 1-2 February 2001 FPU Preliminary Design Review 2 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN DM PROGRAM ETH 2000.2 m Groningen, 1-2 February 2001 Gain: ~11 dB/stg. Tn: ~5.5 K Power: 1.25 mW/stg. G: 710-5 Hz-1/2 (@1 Hz) Reliability: Non passivated Poor pad adhesion Only two “batches” tested Availability: ? Space Q. TBD for HIFI FPU Preliminary Design Review 3 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN DM PROGRAM TRW 2000.1 m (Big) Gain: ~13 dB/stg. Tn: ~5.0 K Power: 1.25 mW/stg. G: 210-5-1.410-4 Hz-1/2 (@1 Hz) Reliability: Good! Oscillations? Baseline for FIRST Availability: 41 for DM Space.Q. Groningen, 1-2 February 2001 In 2001 for Plank. FPU Preliminary Design Review 4 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN DM PROGRAM ETH 1500.2 m Groningen, 1-2 February 2001 Gain: ~13.5 dB/stg. Tn: ~ 4.6 K Power: 1.1 mW/stg. G: <610-5 Hz-1/2 (@1 Hz) Reliability: Non passivated Availability: Not available for DM Space.Q. TBD for HIFI FPU Preliminary Design Review 5 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN DM PROGRAM TRW 2000.1 m (Small) Gain: ~14 dB/stg. Tn: ~4.0 K Power: 1.5 mW/stg. G: - Reliability: Very Small Difficult to bond DSN (Not available for FIRST) Availability: Demo Space.Q. Groningen, 1-2 February 2001 - FPU Preliminary Design Review 6 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN DM PROGRAM ETH 2000.2m TRW 2000.1m (Big) ETH 1500.2m TRW 2000.1m (Small) Gain ~11 dB/stg. ~13 dB/stg. ~13.5 dB/stg. ~14 dB/stg. Tn ~5.5 K ~5.0 K ~ 4.6 K ~ 4.0 K Power 1.25 mW/stg. 1.25 mW/stg. 1.1 mW/stg. 1.5 mW/stg. G 710-5 Hz-1/2 (@1 Hz) 210-5-1.410-4 Hz-1/2 <610-5 Hz-1/2 (@1 Hz) - (@1 Hz) Non passivated Good! Poor pad adhesion Oscillations? Only two “batches” tested Baseline for FIRST Availability ? 41 for DM Not available for DM Demo Space Q. TBD for HIFI In 2001 for Plank. TBD for HIFI - Reliability Groningen, 1-2 February 2001 Non passivated FPU Preliminary Design Review Very Small Difficult to bond DSN (Not available for FIRST) 7 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN DM PROGRAM ETH 200 ETH 150 TRW 200 B TRW 200 S YCF 2010 Low Power (1.1 mW < Pstage < 1.5 mW) 30 15,0 25 12,5 20 10,0 15 7,5 10 5,0 5 2,5 0 Tn (K) Gain (dB) ETH 200 ETH 150 TRW 200 B TRW 200 S 0,0 3 4 5 6 7 8 9 Freq. (GHz) Groningen, 1-2 February 2001 FPU Preliminary Design Review 8 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN DM PROGRAM • New Design – – – – – – – – – – – First prototype using InP TRW 200 devices in both stages Oscillations? Substrate glued to the box using epoxy instead solder MDM connector for the bias circuit Gate voltage divider included in the bias circuit Smaller size (582910.5mm) Mechanical interface with mixer sub-assembly SMA connectors with “O ribbon” connection (Pending due to delivery of connectors) Final decision for ESD protection: LEDs or big capacitors (Pending) EMC filtering (Pending) Bias circuit in the QM and FM different from that in the DM Groningen, 1-2 February 2001 FPU Preliminary Design Review 9 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN DM PROGRAM DM 2001 582910.5mm 623512mm DM 5001 Groningen, 1-2 February 2001 FPU Preliminary Design Review 10 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN DM PROGRAM YCF 2 vs YCF 5 YCF 2 YCF 5 Low Power (1.25 mW < Pstage < 1.5 mW) 30 15,0 25 12,5 20 10,0 15 7,5 10 5,0 5 2,5 0 Tn (K) Gain (dB) YCF 2 YCF 5 0,0 3 4 5 6 7 8 9 Freq. (GHz) Groningen, 1-2 February 2001 FPU Preliminary Design Review 11 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN DM PROGRAM • Results Device Goal Power Dissipation Average Noise Temp. PD [mW]/Stg. Tn [K] 2 5 Average Gain and ripple Minimum Output Ref. Gain Stability out [dB] G Hz-1/2 (@1 Hz) 22 1.5 15 1.410-4 Gav (dB) G (dB) YCF 5001 TRW 2 3.9 26.8 1.32 14 310-5-210-4 YCF 200x ETH 1.25 5.3-5.8 21.7-22.61.2-1.7 13.5-16.5 110-4 Critical Issues: Output Reflection, Gain Stability and Oscillations. Groningen, 1-2 February 2001 FPU Preliminary Design Review 12 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN QM & FM PROGRAMS: FABRICATION BY THE INDUSTRY • Transfer to Industry – Industry: Inexperience in space projects at cryogenic temperatures – CAY: Distribution of QA responsibilities. Difficulties of small groups in dealing with documentation. • Processes – Epoxies (EPOTEK H20E, ABLEFILM 5025) – “O ribbon” connection for SMA connectors – Bonding Groningen, 1-2 February 2001 FPU Preliminary Design Review 13 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN QM & FM PROGRAMS: FABRICATION BY THE INDUSTRY • Components – Passive Components 1.- Components are not qualified at cryogenic temperatures 2.- Chip resistors from SOTA, size 0302, only available as commercial part. – LEDs or big capacitors for ESD protection – InP Transistors: Supplying and qualification JPL – Isolators: Supplying and qualification Pamtech delays – SMA Connectors: Pin orientation Groningen, 1-2 February 2001 FPU Preliminary Design Review 14 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN SUMMARY OF CRITICAL ITEMS • Output reflection • Gain stability • Oscillations (change of device?) • ESD Protection: LEDs or big capacitors • EMC filtering • Passive components at cryogenic temperature • Chip resistors from SOTA, size 0302 • Qualification and procurement of Isolators from Pamtech • SMA Connectors for “O ribbon” connection Groningen, 1-2 February 2001 FPU Preliminary Design Review 15
Related documents