Download Manning Apartments Newsletter

Document related concepts
no text concepts found
Transcript
Manning Apartments Newsletter
June 2015 ***
An update on redevelopment plans from the Cambridge Housing Authority (CHA)
The next Manning revitalization meeting will be on
Monday, June 29 at 6 pm in the community room.
***
All future meetings will be on the last Monday of the month at 6 pm.
Additional meeting notices will not be sent out -- the newsletter will serve as the notice.
Construction Phasing
Schedule Available
Initial Construction Testing
to Begin in Early July
A chart explaining the construction phasing
schedule is attached to this newsletter. CHA staff
is in the process of contacting those residents
who live in apartments in the staging stack to
discuss their relocation options and moving date.
Construction staff from Shawmut Design and
Construction will begin their initial investigations
and testing in early July. They will be working in
a few vacant units and on the roof in the coming
weeks, so do not be alarmed if you see them
around the building.
Residents in later phases will be contacted at
least 90 days in advance. Construction in the first
phase in anticipated to begin in early 2016. CHA
staff will discuss the phasing schedule more at
the June 29th meeting.
The initial testing will require coring through
some floors and walls and may be noisy, but
all work will only occur in daytime hours. The
common spaces will not be affected.
Relocation Reminder
No one has to move out of Manning Apartments.
Everyone will have to move at least once.
No one will have to move before September 2015
unless they choose to.
Everyone will be notified of their moving date at
least 90 days in advance, and CHA staff will meet
with every resident prior to moving.
Options are available for anyone who wants to
move early at any time.
You can contact the Relocation Coordinators at
any time to change your relocation preference or
get more information about moving early:
Camille Perry
[email protected]
617-405-5553
Rashida Jolly
[email protected]
617-405-5554
ACT Yard Sale in August
The Alliance of Cambridge Tenants (ACT) is
having a yard sale Saturday, August 15, 2015
from 12pm to 4pm at Manning Apartments (237
Franklin Street) in the First Floor Community
Room. All proceeds will go to ACT. “Manning
Cafe” will be there selling delicious food to raise
money for Manning Apartments Tenant Council.
More info to come!
Boletín Manning Apartments
Junio de 2015 ***
Actualización de los planes de renovación de la Cambridge Housing Authority (CHA)
***
La siguiente reunión sobre la revitalización de Manning será
el lunes 29 de junio a las 6 pm en el salón comunitario.
En el futuro, todas las reuniones tendrán lugar el último lunes de cada mes a las 6 p. m. No se enviará
notificación de reuniones adicionales --únicamente se informará de ellas mediante el boletín
Cronograma de fases de
construcción disponible
Adjunto a este boletín se incluye un cuadro que
explica el cronograma de fases de construcción. El
personal de CHA se está poniendo en contacto con
aquellos residentes que viven en las torres listas
para la construcción para discutir con ellos sus
opciones de reubicación y su fecha de mudanza.
Los residentes en las siguientes fases recibirán
notificación con al menos 90 días de antelación. Se
espera que las obras en la primera fase comiencen
a principios de 2016. El personal de CHA discutirá
en mayor profundidad el cronograma de fases en la
reunión del 29 de junio.
Las pruebas iniciales de
construcción comenzarán a
principios de julio
El personal de obras de Shawmut Design and
Construction comenzará sus investigaciones y
pruebas iniciales a principios de julio. Trabajarán
en unidades vacías y en el tejado durante las
próximas semanas, así que no se alarme si los ve
en el edificio.
Para las pruebas iniciales es necesario acceder
a los suelos y las paredes y eso puede producir
ruidosv pero solo llevarán a cabo durante el día.
Los espacios comunes no se verán afectados.
Recordatorio de reubicación
Nadie tiene que mudarse fuera de Manning
Apartments.
Todos tendrán que mudarse al menos una vez.
Nadie deberá mudarse antes de septiembre de
2015, a no ser que ellos quieran.
Todos serán notificados de su fecha de mudanza
con no menos de 90 días de anticipación, y el
personal de la CHA se reunirá con cada residente
antes de la mudanza.
Hay opciones disponibles en cualquier momento
para aquellos que quieran mudarse antes.
Pueden ponerse en contacto con los
coordinadores de reubicación en cualquier
momento para modificar sus preferencias de
realojo o para obtener información sobre las
opciones para mudarse antes:
Camille Perry
[email protected]
617-405-5553
Rashida Jolly
[email protected]
617-405-5554
Bazar (yard sale) de ACT
en agosto
Alliance of Cambridge Tenant (ACT) abrirá un
bazar (yard sale) el sábado 15 de agosto de 2015,
desde las 12pm a las 5pm en la Sala comunitaria
del primer piso de Manning Apartments (237
Franklin Street). Los beneficios se destinarán a
ACT. “Manning Café” venderá deliciosa comida
para recaudar fondos para Manning Apartments
Tenant Council. ¡Pronto daremos más detalles!
Bilten Manning Apartments
Jen 2015
***
Yon mizajou nan plan re-devlopman nan Cambridge Housing Authority (CHA)
Pwochen reyinyon lansman Manning pral fèt lendi 29 jen,
a 6 pm nan sal kominotè a.
***
Tout fiti reyinyon yo pral fèt nan dènye lend mwa yo a 6 pm. Nou p ap voye avi pou lòt
reyinyon yo -- bilten an ap sèvi kòm avi a.
Kalandriye Faz Konstwiksyon
ki Disponib
Yon tablo ki eksplike kalandriye faz konstwiksyon
an tache nan bilten sa a. Ekip CHA nan pwosesis
pou kontakte rezidan k ap viv nan apatman
ki nan sekans montaj pou diskite sou chwa
demenajman yo ak dat amenajman yo.
N ap kontakte rezidan ki nan faz apre yo nan
omwen 90 jou davans. Konstwiksyon nan premye
faz nou prevwa a pral kòmanse nan kòmansman
ane 2016. Ekip CHA pral diskite sou kalandriye faz
la nan reyinyon 29 jwen an.
Premye Tès Konstwiksyon
Pral Kòmanse nan
Kòmansman Mwa Jiyè
Ekip konstwiksyon ki nan Shawmut Design and
Construction pral kòmanse premye rechèch ak
tès yo nan kòmansman mwa jiyè a. Yo pral travay
nan kèk inite vid epi sou twati a nan semèn k ap
vini yo. Poutèt sa, ou pa bezwen alame si ou wè
yo toutotou bilding nan.
Premye tès la ap bezwen kawotaj nan kèk
planche ak miray epitou ka gen bwi, men tout
travay la ap pran kèk èdtan sèlman nan lajounen.
Espas komen yo p ap afekte nan travay sa a.
Rapèl sou Demenajman
Pèsòn pa gen obligasyon pou soti nan Manning
Apartments.
Tout moun ap gen pou demenaje omwen yon sèl
fwa.
Pèsòn p ap gen pou demenaje anvan mwa
septanm 2015 sof si yo chwazi fè sa.
Tout moun ap resevwa avi sou dat pou yo
demenaje omwen 90 jou davans, epi ekip CHA ap
rankontre avèk chak rezidan anvan yo demenaje.
Chwa yo disponib pou nenpòt moun ki vle
demenaje bonè nenpòt lè.
Ou kapab kontakte Kowòdonatè Demenajman
yo nenpòt lè pou chanje preferans demenajman
ou oswa pou jwenn plis enfòmasyon sou
demenajman bonè:
Camille Perry
[email protected]
617-405-5553
Rashida Jolly
[email protected]
617-405-5554
Lavant nan Garaj ACT nan
Mwa Out
Alyans Lokatè Cambridge [Alliance of
Cambridge Tenants (ACT)] ap gen yon lavant
nan garaj samdi 15 out 2015 ant 12pm ak 5pm
nan Manning Apartments (237 Franklin Street)
nan Premye Etaj Sal Kominotè a. Tout resèt yo
prale pou ACT. “Manning Cafe” ap la pou vann
manje bon gou pou ranmase lajan pou Komite
Lokatè Manning Apartments. N ap bay plis
enfòmasyon apre.
Manning Apartments Newsletter
2015年6月
***
An update on redevelopment plans from the Cambridge Housing Authority (CHA)
The next Manning revitalization meeting will be on
6Monday,
29 June 29 at 6 pm in the community room.
***
All future meetings will be on the last Monday of the month at 6 pm.
Additional meeting notices will not be sent out -- the newsletter will serve as the notice.
分期施工时间安排已经出台
7月初开始初期施工试验
本期快报随附一张图表,说明施工分期时间安
排。剑桥住房管理局的工作人员正在与动工批
次公寓单位的住户联系,协调搬迁选择和搬迁
日期。
7月初,Shawmut Design and Construction公
司的施工人员将开始初期调查和试验。未来几
周中,施工人员会在几个腾空的公寓单位中和
屋顶上进行作业,因此如果看到楼内有施工人
员,不要紧张。
对较晚开工公寓批次的住户,至少会提前90天
与住户联系。第一期预计2016年初开工。剑桥
住房管理局的工作人员会在6月29日的会议上详
细介绍分期施工时间安排。
搬迁提示
在初期试验中,需要对某些地板和墙壁钻孔取
芯,可能噪音很大,但所有作业都会安排在白
天进行。公共空间不受影响。
617-405-5553
不强迫任何住户搬离曼宁公寓。
每个住户最终都至少必须搬迁一次。
2015年9月之前,任何住户都不是必须搬迁。
至少提前90天向各住户告知搬迁日期,剑桥住
宅管理局的工作人员在搬迁前会与各住户单独
召开会议。
任何住户在任何时候希望提前搬迁,都可以安
排。
您可随时与搬迁协调员联系,修改自己的搬迁
意向。
Camille Perry
[email protected]
617-405-5553
Rashida Jolly
[email protected]
617-405-5554
ACT在8月份举行庭院旧货出售义
卖活动
剑桥租房人联盟(ACT)定于2015年8月15日(
星期六)中午12点至5点举行义卖活动,地点
是曼宁公寓(富兰克林街237号)一层公共活
动室。义卖所得全部捐给ACT。届时“曼宁餐
厅”会到场出售可口的食物,为曼宁公寓租户
委员会筹集经费。陆续会有更多信息!