An update on redevelopment plans from the Cambridge Housing Authority (CHA)
The next Manning revitalization meeting will be on
Monday, November 30 at 6 pm in the community room.
***
** The December meeting will be held on Monday, January 4 to accommodate the holidays.
Construction Work Begins
New Intercom/Buzzer System
As you have noticed, Shawmut has begun
construction preparation work (“enabling
work”) in the outside patio, balconies, vacant
stack of units, and entryway. The CHA team
will continue to send out resident notices
when work will impact residents in a new way
or result in some temporary inconveniences.
We will be switching to a new buzzer system
in the coming weeks once the new entryway
is ready at that time. We will be providing you
with a temporary landline phone if you don’t
have one, and we will make sure everyone
understands how to use the new system
before we make the switch.
Over the next few weeks the contractors
will be completing the temporary entryway,
setting up the temporary intercom and
buzzer system, and preparing the temporary
service locations such as the temporary
laundry room in 9C and the temporary
management office in 3J.
IF YOU HAVEN’T RETURNED YOUR TELEPHONE
SURVEY FORM TO TONYA’S OFFICE YOU MUST
DO SO AS SOON AS POSSIBLE. This is very
important.
The contractors will be using one elevator
on weekday mornings between 6 am and
8 am to move materials until the exterior
material hoist is set up in mid- to lateDecember. Otherwise the contractors should
not be using the resident elevators to move
materials. If you see this happening please
report it to Belinda Luscinskas, the on-site
construction clerk, in apartment 4L or at 617901-3211.
Temporary Electricity Shutdown
Thank you for your cooperation and patience
as we begin construction and work out any
unforeseen challenges that may arise.
Relocation Reminder
The relocation coordinators will continue
to work with you to notify you of your
moving date and make sure you have all
the information you need. There are always
The contractors will have to shut down
the electricity for a few hours on one
day in the next few weeks. If you are on
oxygen or require constant electricity for
medical reasons please talk to Tonya in the
management office immediately. CHA will
help residents relocate to the community
room, where there will be electricity, and
provide snacks and services as necessary.
options to move off-site if you are interested.
You can contact the relocation coordinators at
any time.
Camille Perry
617-405-5553
[email protected]
Rashida Jolly
617-405-5554
[email protected]
Bilten Manning Apartments
Novanm 2015 ***
Yon mizajou nan plan re-devlopman nan Administrasyon Lojman Cambridge (CHA)
Pwochen reyinyon sou modènizasyon Manning pral fèt
Lendi 30 Novanm a 6 pm nan sal kominotè a.
** Reyinyon an Desanm yo pral Lendi, 4 janvye li akomode jou ferye yo.
Konstriksyon kòmanse
***
Nouvo entèrfon / sistèm
vibrer
Kòm ou te remake, Shawmut te kòmanse
travay sou preparasyon nan konstriksyon an
sou patyo deyò, balkon, inite vid gwo kay won
an ak pòtay lavil la. CHA ap kontinye voye avi
lè travay la ap gen yon enpak sou moun ki
abite nan yon nouvo fason oswa mennen nan
kèk deranjman tanporè.
Se pou nou chanje nan yon nouvo sistèm
nan tenbr nan semèn kap vini yon fwa pòtay
la nouvo se pare. Nou pral ba ou yon ti tan
telefòn fiks si ou pa gen yon sèl, epi nou pral
asire ke tout moun konprann kouman yo sèvi
ak nouvo sistèm sa a anvan yo fè chanjman
an.
Nan semèn kap vini kontraktè yo pral ranpli
antre pou yon ti tan, kreye sistèm entèrfon ak
vibrer pou yon ti tan, ak preparasyon an nan
sant sèvis pou yon ti tan, kòm yon ti tan Lesiv
9C la ak pou yon ti tan 3J biwo administrasyon
yo.
SI ou tounen FÒM SONDAJ telefòn ou a
office an ta dwe fè li pi vit ke posib. Sa a se trè
enpòtan.
Kontraktè yo pral lè l sèvi avèk yon leve nan
maten yo soti nan Lendi a Vandredi ant 6
am ak 8 am pou avanse pou pi materyèl yo
asansè a te materyèl eksteryè etabli nan mitan
mwa nan fen mwa Desanm. Sinon, kontraktè
pa dwe itilize asansè rezidan pou avanse pou
pi materyèl yo. Si ou wè sa a rive tanpri rapòte
li nan Belinda Luscinskas, travayè sosyal la
konstriksyon nan 4L apatman oswa 617-9013211.
Mèsi pou kowoperasyon ou ak pasyans ak
rezoud defi enprevi.
Rapèl Demenajman
Koòdonatè Demenajman kontinye travay avèk
ou dwe notifye dat mouvman ou yo epi fè w
ke ou gen tout enfòmasyon ou bezwen. Gen
toujou opsyon pou avanse pou pi nan sit si ou
Elektrisite Tanporè are
Antreprenè yo pral gen fèmen elektrisite a
pou kèk èdtan nan yon jou, nan semèn kap
vini. Si ou se sou oksijèn oswa mande pou
elektrisite konstan pou rezon medikal tanpri
pale ak Tonya nan biwo a jesyon imedyatman.
Moun ki abite èd CHA deplase nan sal la nan
kominote a, kote pral gen elektrisite, epi yo
ofri ti goute ak sèvis jan sa nesesè.
se ki enterese. Ou kapab kontakte koòdonatè
yo nan demenajman nan nenpòt ki lè.
Camille Perry
617-405-5553
[email protected]
Rashida Jolly
617-405-5554
[email protected]
Boletín Manning Apartments
Noviembre 2015
***
Actualización sobre los planes de reconstrucción de Cambridge Housing Authority (CHA)
La próxima reunión de modernización de Manning se celebrará
el lunes 30 noviembre a las 6 pm en la sala comunitaria.
** La reunión de diciembre será el lunes 4 de enero a albergar las fiestas.
Inicia construcción
Como usted ha notado, Shawmut comenzó
el trabajo de preparación de la construcción
en el patio exterior, balcones, torre vacante
de unidades, y la puerta de entrada. CHA
continuará enviando avisos cuando el
trabajo tendrá un impacto en los residentes
de una manera nueva o dar lugar a algunos
inconvenientes temporales.
Durante las próximas semanas los contratistas
estarán completando la entrada temporal, la
creación del sistema de intercomunicación
y el zumbador temporal, y la preparación de
los centros de servicio de carácter temporal,
como la lavandería temporal 9C y la oficina de
gestión temporal de 3J.
Los contratistas estarán utilizando un
ascensor en las mañanas de lunes a viernes
entre las 6 am y las 8 am a mover los
materiales hasta que el elevador material
exterior se estableció a mediados o finales
de diciembre. De lo contrario, los contratistas
no deben utilizar los ascensores residentes
para mover los materiales. Si usted ve que
esto ocurra por favor repórtelo a Belinda
Luscinskas, el empleado de la construcción,
en el apartamento 4L o al 617-901-3211.
Gracias por su cooperación y paciencia como
resolver los desafíos imprevistos.
Recordatorio Reubicación
Los coordinadores de reubicación
continuarán trabajando con usted para
notificarle de su fecha de mudanza y
asegurarse de que tiene toda la información
que necesita. Siempre hay opciones
***
Nueva Intercom / Sistema
Zumbador
Vamos a cambiar a un nuevo sistema de
timbre en las próximas semanas una vez
que la nueva puerta de entrada está listo. Le
daremos un teléfono fijo temporal si usted no
tiene uno, y nos aseguraremos de que todo
el mundo entiende cómo utilizar el nuevo
sistema antes de hacer el cambio.
SI USTED NO HA VUELTO SU FORMA
ENCUESTA DE TELÉFONO A LA OFICINA DEBE
HACERLO LO ANTES POSIBLE. Esto es muy
importante.
Apagar Electricidad Temporal
Los contratistas tendrán que apagar la
electricidad durante unas horas en un día,
en las próximas semanas. Si usted está en el
oxígeno o requiere de electricidad constante
por razones médicas por favor hable con
Tonya en la oficina de gestión de inmediato.
CHA ayudará a los residentes trasladarse
a la sala de la comunidad, en el que habrá
electricidad, y ofrecer bocadillos y servicios
según sea necesario.
para moverse fuera de sitio si usted está
interesado. Puede ponerse en contacto con
los coordinadores de reubicación en cualquier
momento.
Camille Perry
617-405-5553
[email protected]
Rashida Jolly
617-405-5554
[email protected]